Installation guides

Internal vertical wall panels — factory type environment

  • Check floor is level and mark line for fit of angle.
  • Drill and fix floor fixings at 300mm centres. See drawing number FMV-05C.
  • Repeat this action for one of the head angles only.
  • Apply continuous bead of sealant to inside edge of both angles (head and base).
  • Offer the vertical panel up to the angle and ensure panel is plumb before fixing.
  • Face fix both the head and the base angles to the panel at 300mm centres.
  • Hold panel in position and offer the next panel to it.
  • Slide panel into the next panel, ensure panel cores fit tightly together – if necessary use a 3mm spacer to ensure consistent joint widths.
  • Pack any voids with mineral fibre – minimum density 23 kg/m3.
  • Fix second panel to angles repeating above.
  • Lay continuous bead of sealant to both floor and panel face in readiness for positioning of second (face) angles.
  • Repeat this in preparation for fixing of the head angles also.
  • Fix angles to panels at 300mm centres.
  • Apply continuous bead of mastic to panel/panel joints ensuring that no gaps are present.
  • See installation drawings for additional information.